Rancho Mission Viejo Phase 3.3/3.4
Located in the popular Rancho Mission Viejo development, this next phase involves grading of over 300 acre and reaching 10 million cubic yards. While this is a large mass grading site, this project also involves significant utility infrastructure installation for both water main transmission and storm drain water conveyance, stabilized earth retaining walls, almost 3 miles of drainages ditches and all final erosion control. We look forward to completing this project in the summer of 2025.